The following is a list of Gorgon Project contractors:

  • Operator: Chevron (50%), ExxonMobil and Shell (25% each)
  • Location:North West Shelf of Western Australia
  • Timeframe: 3 year construction
  • Cost: $50bn
  • Employment: In excess of 6,000
  • Status:Approved, construction commenced in January 2010.

Awarded Contracts and Employment Opportunities include:

  • Thiess/Decmil Pty Ltd/Kentz Pty Ltd Joint Venture (TDKJV); contracted to design and construct an accommodation construction village on Barrow Island for Chevron Australia.
  • Offshore Marine Services Alliance (OMSA); marine vessel and labour supply.
  • Australian Portable; contracted to design, construct and operate a 300 bed rapid deployment camp.
  • Mermaid Marine; access to a common-user marine supply base located at Dampier in the north-west of Western Australia.
  • Thiess; site preparation works and construction of temporary facilities on Barrow Island.
  • Toll; to manage the supply base and logistics services on Barrow Island. It is anticipated about 200 people will be employed under the extendable three-year contract.
  • JP Kenny Pty Ltd and Technip Oceania Pty Ltd; Gorgon Upstream Joint Venture (GUJV) as the front end engineering and design (FEED) and engineering, procurement, construction and management (EPCM) contractor with respect to the upstream facilities for the Greater Gorgon development.
  • The Kellogg Joint Venture - Gorgon (KJV-G) including KBR, JGC Corporation of Japan, and Australian-based partners Clough Projects Australia Pty Ltd and Hatch Associates Pty Ltd have been selected to perform the FEED for the downstream part of the project.
  • The Saipem Leighton Consortium was selected to develop the $900m Jetty and Marine Structures project. The scope of work includes design, material supply, fabrication, construction and commissioning of Australia’s longest LNG jetty which also includes supply, fabrication and construction of marine structures. Project design is underway and construction commenced late 2010 on Barrow Island, to be completed in 2013.
  • CBI was awarded the contract for the engineering, procurement, fabrication and construction of two 180,000 cubic metre full containment LNG tanks, four condensate tanks, and the associated piping, electrical, instrumentation and civil works.
  • Neptune Marine Services; contracted to provide diving, survey and vessel support services, which forms part of the scope of works awarded to Marine & Civil Construction. The scope also includes installation of piping and the offshore pump station associated with the temporary desalination plant at Barrow Island, diving support for the construction of a new supply barge facility, general construction and dive support. Work commenced in January 2010.
  • Compass: catering and camp services.
  • Monadelphous; facility management.
  • Agility Project Logistics; supply base operation and road transport.
  • Omega Security Services; site security services.
  • Health Services Australia Ltd; medical services and personnel.
  • ERTECH; initial civil works.
  • Australian Portable Camps; construction of camp on Barrow Island.
  • Allseas; offshore pipeline contract.
  • Aker Solutions; design of the Mono Ethylene Glycol Plant.

The purpose of providing this list is to identify potential construction work opportunities with Gorgon Project contractors.