Construction on the world-class Ichthys Project has already begun. Below is the timeline for construction of the key components of this large-scaleLNG development.

Q1 2012 – Q1 2014        Onshore civil site preparation and Module                 

Module Offloading Facility (MOF) construction

The gas plant will be built offsite in a ‘modular’ fashion, in chunks, rather than in the traditional ‘stick-build’ fashion where everything’s built on site. This is a more efficient construction method where pieces are pre-built, hauled to site by barge and placed in position and bolted to other modules. Some of these ‘modules’ will be up to 7000 tonnes in weight and up to 40 metres in length.

Q2Q2 2012 – 2015         Deepening the shipping channel

Dredging is required to create a safe shipping channel through Darwin’s working harbour, along with a berthing area for LNG tankers arriving at the gas processing facility on Blaydin Point.

Dredging is required because water depths in the area are currently too shallow for safe access for liquefied natural gas (LNG), liquefied petroleum gas (LPG) and condensate tankers.

Q2 2013 – Q2 2016        Procurement and construction of LNG tanks

Separate tanks must be constructed for the LNG, LPG and condensate (a valuable gas by-product). This process will take about three years.

Q3 2013 – Q4 2015        Offloading jetty procurement and construction

This phase is about finishing the design and construction of the jetty. The offloading jetty transports the products (LNG, LPG and condensate) from the onshore facilities to the export vessels.

Q1 2014 – Q3 2014        Gas Export Pipeline (GEP) rock transport to East Arm Port

Quarried rock will be layered over the gas pipeline that runs along the bed of Darwin Harbour to protect it from ships, anchors and other hazards. This is called ‘rock armour’ and will take about six months to get in place.

2014 – End 2016           LNG Train on-site installation and hook-up

The onshore plant will have two LNG ‘trains’ that process the gas by cooling it to a liquefied form for transport to market. Once both trains are installed, the first train will be brought into production, and when at full capacity, the second train will then go into commissioning.

Further information:  http://www.inpexcareers.com/


Jobs from INPEX
Company Site Representative - SPS Fabrication

INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 27 countries. It ranks in the Top 50 ...

HSE Team Leader

  The role of HSE Team Leader is to provide HSE leadership, guidance and support relating to all activities undertaken in readiness and during ...

Construction Engineer

INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. It ranks in the Top 50 ...

Senior HSE Advisor

  The role of Senior HSE Advisor is responsible for providing HSE guidance and support to the Ichthys Facilities (Onshore and Offshore). You will ...

Senior Flow Assurance Engineer

INPEX OPERATIONS   INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. ...

Competency Administrator

INPEX OPERATIONS   INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. ...

ICSS Engineer

INPEX OPERATIONS   INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 ...

Principal Process Engineer

INPEX OPERATIONS   INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. ...

Support Engineer - Instrumentation/Electrical

INPEX OPERATIONS    INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. ...

Senior Process Control Engineer

INPEX OPERATIONS   INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. ...

Subsea Controls Engineer

INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. INPEX is ranked among ...

Operations Technician - Production (Offshore)

INPEX Corporation is an international oil and gas company currently involved in more than 70 projects across 26 countries. INPEX is ranked among ...

More blogs by INPEX

Beyond FID

by The Recruitment Team on 14 Mar 12

Building the future of energy in 2012

by The Recruitment Team on 21 Feb 12

FEEDing success offshore

by The Recruitment Team on 14 Feb 12

Extraordinary Ichthys

by The Recruitment Team on 19 Jan 12

Community springs to life in Darwin

by The Recruitment Team on 20 Dec 11

Ichthys helps build bright future for the Territory

by The Recruitment Team on 02 Nov 11

INPEX takes the show offshore

by The Recruitment Team on 12 Sep 11

Ichthy’s enjoys a big FEED

by The Recruitment Team on 23 Aug 11